Essential for the Start of Winter: Have you drained the water from your pump trucks?
Release time:
2025-11-11
Data source:
Concrete pump trucks are highly susceptible to freezing and cracking of components such as pumps, water tanks, and delivery pipelines in low-temperature environments.
Why drain the water from the pump truck?
Concrete pump trucks are highly susceptible to freezing and cracking of components such as pumps, water tanks, and delivery pipelines in low-temperature environments. Therefore, drainage is crucial when using pump trucks in winter, especially in northern regions. Proper drainage procedures can effectively prevent equipment damage from freezing and ensure the normal operation and service life of the pump truck.
Five key points for preventing equipment from freezing in northern regions
01. Drainage Inspection Before Construction
Before starting the pump truck in winter, a comprehensive inspection of the entire drainage system is necessary. Check whether there is water accumulation or ice on components such as the pump, water tank, hopper, and conveying pipelines. If ice is found, it should be drained immediately to prevent damage to equipment components due to freezing at low temperatures. At the same time, check whether the drain valves are flexible to ensure that the drainage system is unobstructed.
02. Drainage Maintenance During Construction
During winter construction, concrete conveying and equipment cleaning operations generate a large amount of wastewater. At this time, it is crucial to ensure the normal operation of the piston water tank and promptly clean any impurities within the tank to prevent accumulation and maintain drainage efficiency. The pump power should be adjusted appropriately according to the actual drainage volume to ensure timely and effective wastewater discharge. When receiving and transferring wastewater, the hopper must be properly sealed to prevent spillage and freezing on equipment surfaces or in the surrounding environment.
03. Drainage Operations After Construction
Upon completion of the construction task, a comprehensive drainage operation must be carried out immediately. First, thoroughly clean the remaining material and wastewater from the pump truck hopper and piston water tank. Then, start the water pump to extract and empty all water from the water tank and conveying pipelines. For the conveying pipelines, compressed air can be used to purge them to ensure no water remains. During the drainage process, if any equipment components are found to be frozen, do not force the equipment to start. Instead, use warm water to slowly thaw them to avoid damaging the equipment.
04. Key Points for Drainage in Routine Maintenance and Care
During the winter when the pump truck is idle, regular drainage checks and maintenance should be performed. Start the water pump periodically and run it briefly to drain any accumulated water. Check the insulation layer of the water tank and piston water groove for damage; repair any damage promptly. For pump trucks that are not used for extended periods, thoroughly drain all drainable components and take protective measures to prevent moisture from entering the equipment and causing icing.
05. Drainage Treatment in Special Circumstances
When encountering extremely cold weather or when the pump truck is exposed to the outdoors for extended periods, in addition to routine drainage operations, consider adding an appropriate amount of antifreeze to the water to lower the freezing point and prevent water from accumulating and freezing inside the equipment. However, it is important to select antifreeze suitable for the pump truck and add it according to the specified ratio to avoid adverse effects such as corrosion on the equipment.
Other News
JIUHE Customized 49M Concrete Boom Pump Truck
JIUHE Heavy Industry is committed to providing practical concrete machinery solutions for customers worldwide.
Concrete Trailer Pump: Maximum Pumping Height, Distance, and Optimal Setup
Discover how high and far a concrete trailer pump can deliver concrete. Learn about pumping distance, pipeline design, concrete quality, and maintenance tips.
JIUHE 25m Ladder Lift Truck with Customized Alarm Function
We offer comprehensive customization services to meet your specific needs.
What to Do When a Concrete Trailer Pump Fails to Discharge? 7 Common Causes and Solutions
Why does a concrete trailer pump suddenly stop discharging concrete? What causes concrete pumping problems, and how can they be resolved?
How to Operate a Trailer Concrete Pump: 3 Stages
Learning how to operate a trailer concrete pump starts before the motor runs. Roughly ten minutes of checks prevents most of the failures that cost hours later. Work through them in this order.
Concrete Pump Truck Operator Safety: 5 Major Accident-Prone Areas to Monitor
Regardless of the type, all concrete pump trucks operate on the same fundamental principle, though there may be minor variations.
Potential hazards encountered during concrete pump truck pipeline blockages
Experiencing a pipe blockage in a concrete pump truck during construction is a major headache; it not only delays the project schedule and proves highly troublesome to resolve, but can even lead to dangerous situations.
What causes the S-tube in a concrete pump to fail to swing into the correct position?
Today, we will explore the underlying causes of this incomplete oscillation in the S-tube.