News
CONTACT US
National Marketing Hotline:
International Sales Hotline:
After-sales Hotline:
Contact Email:
Contact Address:
NO.977 Qingwei Road, Jimo District, Qingdao City
JIUHE HGL20-4M Crawler Hydraulic Concrete Placing Boom: The Ultimate Solution for Efficient Concrete Placement in Modern Construction
Release time:
2026-06-10
Data source:
Among the most essential pieces of equipment on modern construction sites is the crawler hydraulic concrete placing boom, a machine specifically designed to distribute concrete efficiently and accurately across large work areas.
As construction projects continue to grow in scale and complexity, contractors are increasingly seeking advanced equipment that can improve productivity, reduce labor costs, and ensure high-quality concrete placement. Among the most essential pieces of equipment on modern construction sites is the crawler hydraulic concrete placing boom, a machine specifically designed to distribute concrete efficiently and accurately across large work areas.
The HGL20-4M Crawler Hydraulic Concrete Placing Boom, developed by JIUHE Heavy Industry, represents a new generation of intelligent concrete distribution equipment. Combining mobility, flexibility, hydraulic precision, and reliable performance, this placing boom helps contractors achieve faster concrete pouring operations while maintaining exceptional construction quality.
Whether used in high-rise buildings, bridge construction, industrial facilities, tunnels, or large infrastructure projects, the HGL20-4M delivers outstanding performance and becomes an indispensable partner for concrete pumping systems.
What Is a Crawler Hydraulic Concrete Placing Boom?
A crawler hydraulic concrete placing boom is a specialized construction machine designed to distribute pumped concrete over a large area through a rotating hydraulic boom system. Working together with trailer concrete pumps, stationary concrete pumps, or truck-mounted concrete pumps, the placing boom transfers concrete precisely to the required pouring location.
Unlike traditional manual concrete distribution methods, a hydraulic placing boom significantly improves efficiency by:
- Extending concrete placement reach
- Reducing labor requirements
- Improving pouring accuracy
- Increasing construction speed
- Enhancing site safety
- Minimizing material waste
The HGL20-4M takes these advantages further by integrating a crawler traveling system, allowing the equipment to move independently around the construction site without requiring cranes or extensive relocation procedures.
HGL20-4M Crawler Hydraulic Concrete Placing Boom Overview
The HGL20-4M is engineered to meet the demanding requirements of modern construction projects. Equipped with a four-section folding boom and a robust crawler chassis, the machine offers excellent mobility and a wide working range.
Key Technical Specifications
- Maximum placing height: 19.9 meters
- Four-section M-type folding boom
- 360° continuous rotation
- Boom pitch angle: 0°–90°
- Delivery pipeline diameter: 125 mm
- End hose length: 3 meters
- Hydraulic system pressure: 32 MPa
- Diesel engine power: 65 kW
- Travel speed: Up to 3 km/h
- Machine weight: 8.6 tons
- Wireless remote control system
- Manual control option
These specifications make the HGL20-4M a highly efficient concrete placing solution suitable for a wide variety of construction environments.

Why Construction Companies Need Advanced Concrete Placing Equipment
Concrete placement plays a critical role in determining the strength, durability, and quality of any structure. Traditional pouring methods often involve significant manual labor, which can lead to:
- Uneven concrete distribution
- Increased labor expenses
- Lower efficiency
- Construction delays
- Higher safety risks
Modern contractors are under constant pressure to complete projects faster while maintaining strict quality standards. This is why advanced concrete placing equipment has become a necessity rather than a luxury.
The HGL20-4M crawler hydraulic concrete placing boom addresses these challenges by providing automated, precise, and efficient concrete distribution.
Outstanding Mobility with Crawler Chassis Technology
One of the most significant advantages of the HGL20-4M is its crawler walking system.
Unlike stationary placing booms that require disassembly and repositioning, the crawler chassis enables the machine to move independently throughout the job site.
Benefits of Crawler Mobility
Adaptability to Rough Terrain
Construction sites often feature uneven ground, mud, gravel, and obstacles. The crawler system provides superior traction and stability, ensuring reliable movement even under challenging conditions.
Faster Relocation
Operators can quickly move the machine between pouring zones without the need for additional lifting equipment, significantly reducing downtime.
Improved Project Efficiency
By eliminating lengthy relocation procedures, contractors can maintain continuous concrete pouring operations and accelerate project schedules.
Enhanced Stability
The crawler design provides a low center of gravity, ensuring stable operation during boom extension and rotation.
For large-scale projects where frequent movement is required, crawler mobility becomes a major productivity advantage.
Other News
Customized Concrete Pump Trucks: How JIUHE Delivers Unique Solutions for European Customer
Discover JIUHE customized concrete pump trucks with arm status detection, outrigger monitoring, hopper vibration motors and flexible equipment configurations.
JIUHE Customized 49M Concrete Boom Pump Truck
JIUHE Heavy Industry is committed to providing practical concrete machinery solutions for customers worldwide.
Concrete Trailer Pump: Maximum Pumping Height, Distance, and Optimal Setup
Discover how high and far a concrete trailer pump can deliver concrete. Learn about pumping distance, pipeline design, concrete quality, and maintenance tips.
JIUHE 25m Ladder Lift Truck with Customized Alarm Function
We offer comprehensive customization services to meet your specific needs.
What to Do When a Concrete Trailer Pump Fails to Discharge? 7 Common Causes and Solutions
Why does a concrete trailer pump suddenly stop discharging concrete? What causes concrete pumping problems, and how can they be resolved?
How to Operate a Trailer Concrete Pump: 3 Stages
Learning how to operate a trailer concrete pump starts before the motor runs. Roughly ten minutes of checks prevents most of the failures that cost hours later. Work through them in this order.
Concrete Pump Truck Operator Safety: 5 Major Accident-Prone Areas to Monitor
Regardless of the type, all concrete pump trucks operate on the same fundamental principle, though there may be minor variations.
Potential hazards encountered during concrete pump truck pipeline blockages
Experiencing a pipe blockage in a concrete pump truck during construction is a major headache; it not only delays the project schedule and proves highly troublesome to resolve, but can even lead to dangerous situations.