News
CONTACT US
National Marketing Hotline:
International Sales Hotline:
After-sales Hotline:
Contact Email:
Contact Address:
NO.977 Qingwei Road, Jimo District, Qingdao City
How can the long boom of a concrete pump truck balance flexible steering with construction stability?
Release time:
2026-03-11
Data source:
In engineering construction, while long boom scaffolding improves the construction range and efficiency, the trade-off between flexibility and stability is also quite prominent. To balance flexible maneuvering and construction stability, long boom scaffolding can be addressed from the following aspects.
In engineering construction, while long boom scaffolding improves the construction range and efficiency, the trade-off between flexibility and stability is also quite prominent. To balance flexible maneuvering and construction stability, long boom scaffolding can be addressed from the following aspects.
✅1.Optimize structural design
Advanced structural design methods, such as full-condition load simulation design and analysis technology, are employed to ensure uniform load distribution, lower center of gravity, and improved stability of the boom. To guarantee more flexible boom movement, the JIUHE pump truck adopts the latest international external linkage structure design, with through-shaft pins. The movement joints of the boom and linkage have undergone repeated testing and optimization to ensure that the cylinder force remains stable throughout the entire process. The structural design reduces vibration sources and significantly extends the boom's lifespan.
✅2.Application of new materials
Using lightweight, high-strength materials reduces boom weight and improves maneuverability while ensuring structural strength and stability. JIUHE pump trucks use high-strength steel plates, with a yield strength several times that of ordinary steel plates.
✅3.Advanced control technology
By utilizing boom vibration reduction and motion coordination control technology, boom swaying during construction is reduced, facilitating pump operator operation. JIUHE pump trucks employ this technology, reducing boom swaying by more than 50%. The patented multi-joint, long boom composite motion control technology improves boom placement efficiency and accuracy, and enhances the boom's flexible steering and positioning capabilities.
✅4.Strengthen on-site management
Before construction, a thorough site survey should be conducted, selecting a solid and level surface as the support foundation. Sturdy sleepers or base plates should be used to support the outriggers, ensuring chassis stability. Pump operators must strictly adhere to operating procedures, ensuring the chassis and outriggers are fully extended and level before operating the boom. During operation, the boom's vibration pattern should be carefully monitored to prevent violent swaying, prioritizing efficiency while maintaining stability.

Other News
JIUHE Customized 49M Concrete Boom Pump Truck
JIUHE Heavy Industry is committed to providing practical concrete machinery solutions for customers worldwide.
Concrete Trailer Pump: Maximum Pumping Height, Distance, and Optimal Setup
Discover how high and far a concrete trailer pump can deliver concrete. Learn about pumping distance, pipeline design, concrete quality, and maintenance tips.
JIUHE 25m Ladder Lift Truck with Customized Alarm Function
We offer comprehensive customization services to meet your specific needs.
What to Do When a Concrete Trailer Pump Fails to Discharge? 7 Common Causes and Solutions
Why does a concrete trailer pump suddenly stop discharging concrete? What causes concrete pumping problems, and how can they be resolved?
How to Operate a Trailer Concrete Pump: 3 Stages
Learning how to operate a trailer concrete pump starts before the motor runs. Roughly ten minutes of checks prevents most of the failures that cost hours later. Work through them in this order.
Concrete Pump Truck Operator Safety: 5 Major Accident-Prone Areas to Monitor
Regardless of the type, all concrete pump trucks operate on the same fundamental principle, though there may be minor variations.
Potential hazards encountered during concrete pump truck pipeline blockages
Experiencing a pipe blockage in a concrete pump truck during construction is a major headache; it not only delays the project schedule and proves highly troublesome to resolve, but can even lead to dangerous situations.
What causes the S-tube in a concrete pump to fail to swing into the correct position?
Today, we will explore the underlying causes of this incomplete oscillation in the S-tube.
QUICK CONNECT
CONTACT US
National Marketing Hotline:
+86-18300251951
After-Sales Hotline:
+86053285580031
International Sales Hotline:
+86-18765912751
Contact Email:
inquiry@jiuhezg.com
Contact Address: