Concrete Pump truck "thawing" guide: These things must be done before resuming work!
Release time:
2026-03-06
Data source:
When equipment is put back into operation in the initial stage of resuming work, it is recommended that the first shift be at a medium load to allow each system to gradually adapt and break in. During operation, pay attention to instrument readings and listen to equipment sounds to promptly identify any abnormalities.
With the arrival of the Jingzhe (Awakening of Insects) solar term, concrete pump truck construction projects have gradually resumed across various regions. However, many areas in northern China are still experiencing low temperatures, mostly between 0 and -10℃, which may cause equipment malfunctions. To ensure construction safety and normal equipment operation, there are still many key points to pay attention to before resuming work and during construction.
✅01 Engine and Fuel System Inspection
In low-temperature environments, please use diesel fuel with a freezing point no higher than -10°C to prevent fuel from freezing.
After starting the engine, allow it to idle for a short while to warm up; do not accelerate suddenly. Engine oil is more viscous in winter, so ensure adequate lubrication.
Check the oil-water separator and drain any water promptly to prevent water-containing diesel fuel from freezing and causing starting difficulties.
✅02 Cooling and Liquid System Inspection
Check the antifreeze freezing point and level to ensure they meet local minimum temperature requirements.
After construction, drain all water from the pump truck's water tank, pump, and pipelines to prevent freezing and cracking overnight.
After cleaning the pumping system, operate the "pull-back pump" to drain any remaining water from the pipelines.
✅03 Critical Component Antifreeze Inspection
Inspect the rotary reducer and remove any accumulated water to prevent the casing from freezing and cracking.
Inspect and drain condensate from the air tank and oil-water separator to prevent the changeover switch, solenoid valve, and other pneumatic components from malfunctioning due to freezing.
✅04 Hydraulic System Preheating
After starting the pump truck, it should be run at low speed and low load for a period of time to allow the hydraulic oil to fully warm up and circulate. In winter, the hydraulic oil viscosity is high; running it directly at high speed and high pressure without preheating can easily damage the hydraulic pump and valve assembly.
✅05 Urea Solution Filling
When adding automotive urea, do not overfill; leave adequate expansion space.
When equipment is put back into operation in the initial stage of resuming work, it is recommended that the first shift be at a medium load to allow each system to gradually adapt and break in. During operation, pay attention to instrument readings and listen to equipment sounds to promptly identify any abnormalities.
Other News
How to Properly Clean Concrete Pump Pipes After Pumping
After concrete placement is complete, any remaining concrete in the pump pipes must be cleaned out promptly. How should this cleaning be done?
Everything You Need to Know About Safely Using a Trailer Concrete Pump
The following section outlines operational techniques and important precautions for trailer-mounted concrete pumps.
How to Troubleshoot Unusual Noise from a Concrete Pump
Trailer Concrete pump are a very common type of concrete conveying tool. During construction, they can be used not only for conveying concrete in basements but also for conveying concrete in high-rise buildings, making them quite versatile.
How Do Concrete Pump Trucks Achieve Effective Energy Conservation and Emission Reduction?
National policies respond to energy conservation and emission reduction, and the international environment demands that we also conserve energy and reduce emissions. Therefore, almost all manufacturers and sellers in the construction machinery field are emphasizing energy conservation and environmental protection.
Concrete Pouring Pipe Blockage: Common Causes & Proven Prevention Methods for Pump Pipes
Anyone who works with concrete pump trucks knows that if you're not careful or something goes wrong, the pump pipe can get completely clogged with concrete, turning the concrete into a lump of coal.
How to extend the service life of a concrete pump? Focus on four aspects!
Concrete pumps are now an integral part of construction projects. While each pump is relatively expensive, damage is inevitable during use. How can we extend the lifespan of a concrete pump?
Three Simple Methods to Clean the S-Tube Valve of Your Concrete Pump Truck
The specific method chosen should depend on actual construction conditions, with the ultimate goal of ensuring both effectiveness and cost-efficiency.
Concrete pump truck boom maintenance
Regardless of the type of concrete pump truck, the working principle and maintenance are the same, with only minor differences in some aspects.
QUICK CONNECT
CONTACT US
National Marketing Hotline:
+86-18300251951
After-Sales Hotline:
+86053285580031
International Sales Hotline:
+86-18765912751
Contact Email:
inquiry@jiuhezg.com
Contact Address: