Our Latest News

BLOG


News

CONTACT US

National Marketing Hotline:

+86-18300251951


International Sales Hotline:

+86-18765912751


After-sales Hotline:

+86053285580031


Contact Email:


Contact Address:

NO.977 Qingwei Road, Jimo District, Qingdao City

17

2025-07

Key Practices for Small Loader Use and Care in the Initial Running-in Phase

After a small loader leaves the factory, it is generally stipulated that there is a running-in period (or running-in period) of about 12-50 hours, which is stipulated according to the technical characteristics of the small loader in the early stage of use. The running-in period is an important link to ensure the normal operation of the small loader, reduce the failure rate, and extend its service life. However, at present, some users ignore the special technical requirements of the running-in period of the new machine due to lack of common sense in the use of loaders, or because of tight construction period, or because they want to make profits as soon as possible. Some users even think that the manufacturer has a warranty period anyway, and the manufacturer is responsible for repairing the broken machine, so the machine is overloaded for a long time during the running-in period, resulting in frequent early machine failures. Even when the warranty period is about to come, long-term operation ignores maintenance, and the failure is exposed as much as possible to obtain the manufacturer's warranty. During the last warranty period, the equipment is normal, and after the warranty period, frequent failures will not only affect the normal use of the machine, but also shorten the service life of the machine. Therefore, full attention should be paid to the use and maintenance of the loader during the running-in period.

2025-07-17