News

CONTACT US

National Marketing Hotline:

+86-18300251951


International Sales Hotline:

+86-18765912751


After-sales Hotline:

+86053285580031


Contact Email:


Contact Address:

NO.977 Qingwei Road, Jimo District, Qingdao City

Concrete pump truck boom maintenance

Regardless of the type of concrete pump truck, the working principle and maintenance are the same, with only minor differences in some aspects.


Regardless of the type of concrete pump truck, the working principle and maintenance are the same, with only minor differences in some aspects. Today, we bring you "Maintenance of Concrete Pump Truck Boom", hoping to be helpful to all pump truck operators.

 

The main things to note are:

 

✅(1) The gear oil in the turntable rotary reducer must be completely replaced after the pump truck is used for the first 100 hours, and each subsequent oil change should be performed at intervals of 1,000 hours (or half a year).

 

✅(2) The lubrication at the hinges of the boom, the outriggers, the rotary ring gear bearing and the oil nozzle at the shaft end of the rotary reduction gear should be inspected and filled with oil every 60 working hours.

 

✅(3) Pump truck boom upper maintenance In order to reduce dangers and failures when pumping concrete, delivery pipes with the correct diameter and thickness, correct pipe clamps and safety locks must be used.

 

✅(4) Pump truck boom maintenance: To ensure even wear and extend the life of the delivery pipe, rotate the delivery pipe periodically: for every 5000 cubic meters poured, rotate straight pipes 120 degrees clockwise and bends 180 degrees.

 

✅(5) After the pump truck has been in operation for a period of time, carefully inspect all welds on the turntable, boom, and outriggers. If any weld cracks are found, contact our company immediately for proper handling.

 

✅(6) After pumping concrete, clean the entire pump truck thoroughly. It is strictly forbidden for any concrete residue to remain inside the delivery pipe.

 

JIUHE Concrete Pump Truck reflects years of engineering expertise and strict quality management, offering customers a reliable solution with low operating costs and long service life.

As a professional manufacturer of concrete machinery, JIUHE provides a complete range of concrete pump trucks designed to meet the requirements of projects of every scale. With boom lengths ranging from 17 meters to 80 meters, JIUHE offers flexible pumping solutions for small residential jobs as well as large infrastructure developments.

Built with advanced hydraulic systems, intelligent control technology, and durable structural components, JIUHE concrete pump trucks deliver exceptional pumping performance, reduced maintenance costs, and long service life for customers around the world.

Other News


JIUHE at BAUMA CHINA 2026 – Visit Us at Booth H1.568

Meet JIUHE GROUP at BAUMA CHINA 2026, November 23–26 in Shanghai. Visit Booth H1.568 to explore concrete machinery and customized solutions.


Customized Concrete Pump Trucks: How JIUHE Delivers Unique Solutions for European Customer

Discover JIUHE customized concrete pump trucks with arm status detection, outrigger monitoring, hopper vibration motors and flexible equipment configurations.


JIUHE Customized 49M Concrete Boom Pump Truck

JIUHE Heavy Industry is committed to providing practical concrete machinery solutions for customers worldwide.


Concrete Trailer Pump: Maximum Pumping Height, Distance, and Optimal Setup

Discover how high and far a concrete trailer pump can deliver concrete. Learn about pumping distance, pipeline design, concrete quality, and maintenance tips.


JIUHE 25m Ladder Lift Truck with Customized Alarm Function

We offer comprehensive customization services to meet your specific needs.


What to Do When a Concrete Trailer Pump Fails to Discharge? 7 Common Causes and Solutions

Why does a concrete trailer pump suddenly stop discharging concrete? What causes concrete pumping problems, and how can they be resolved?


How to Operate a Trailer Concrete Pump: 3 Stages

Learning how to operate a trailer concrete pump starts before the motor runs. Roughly ten minutes of checks prevents most of the failures that cost hours later. Work through them in this order.


Concrete Pump Truck Operator Safety: 5 Major Accident-Prone Areas to Monitor

Regardless of the type, all concrete pump trucks operate on the same fundamental principle, though there may be minor variations.